Massive $12.5B gas project over two-thirds done as Saipem puts in ‘critical piece of infrastructure’ offshore Australia

Australian energy player Woodside is continuing to make inroads in developing its giant energy project off the coast of Australia. The latest achievement, concerning an export trunkline installation at this natural gas project, took around a year to be finished, however, Italy’s Saipem has now wrapped up the work. As a result, the pre-commissioning of the trunkline in preparation for the hook-up of the subsea infrastructure will now begin, bringing the $12.5 billion project closer to the first liquefied natural gas (LNG) cargo slated for 2026.

Woodside has confirmed that its Scarborough energy project, which was 67% complete at the end of June 2024, is now more than two-thirds ready, as Saipem has completed the trunkline installation after around 12 months, 433 kilometers, and more than 36,000 lengths of pipe at depths of up to 1,400 meters.

At the end of January 2024, Saipem revealed an incident on the Castorone pipelay vessel during normal pipelaying operations offshore Australia, but the incident did not cause injuries to personnel or any major damages to the ship, however, localized damage to the trunkline was reported. In mid-February, the Italian player got NOPSEMA’s nod to restart Castorone operations.

When operational, the 433 km trunkline will transport gas from the offshore Scarborough field to the onshore Pluto LNG processing facility in Karratha, helping to meet demand for the lower carbon and reliable energy the world needs today and into the future, according to Woodside.

The delivery of the first LNG cargo is expected in 2026, generating more than A$50 billion ($33.43 billion) in direct and indirect taxes for Australia’s economy, over 3,000 jobs during the construction phase, and creating or sustaining almost 600 jobs on average during operations.

While highlighting that the trunkline was “a critical piece of infrastructure” for the Scarborough energy project, requiring installation by specialized vessels and expert teams, Liz Westcott, Woodside Executive Vice President & Chief Operating Officer Australia, emphasized: “The completion of installation is a significant accomplishment, reflecting the dedication of all involved in achieving this project milestone.

“With the last components of the trunkline in place, the focus will be maintained on safely executing the remaining project scopes to support the targeted first Scarborough LNG cargo in 2026. The Woodside, Saipem and sub-contractor teams are to be congratulated on their outstanding delivery of this key element of the project.”

Woodside recently sealed a deal with the Australian Conservation Foundation (AFC) to end a two-year legal challenge regarding a primary environmental approval for the project. Located 375 km off the Pilbara coast of Western Australia, the Scarborough gas project in the Carnarvon Basin entails new offshore facilities connected by an approximately 430 km pipeline to a second LNG train at the existing Pluto LNG onshore facility.

Compartir nota:
Twitter
LinkedIn
WhatsApp
Facebook

Contenido exclusivo para socios

¿Todavía no sos socio?